1. Help Center
  2. Flex Connect

Flex Connect

Flex Connect Operating Guides

  • Flex Connect Assembly GuideAssemble your Flex Connect from the pump out: set riser blocks in order, join the return and supply lines, attach the pump, then connect each Flex Farm.
  • Adding Water to your Flex ConnectFill your Flex Connect from one hose: connect it to the Return Line Drainage Assembly, open the valve, and stop when every Flex Farm tank is half full.
  • Priming your Flex Connect PumpPrime your Flex Connect pump after a dry fill: fill each Flex Farm half full, plug in the pump, and if it still draws air, add hose pressure or a wet vac.
  • Replacing your Flex Connect PumpReplace your Flex Connect pump every 2 to 4 years: unplug it, close both ball valves, unlock the cam locks, and lock in the new pump. Re-prime if needed.
  • Disassembling & Cleaning your Flex ConnectDeep clean your Flex Connect every six months: disconnect the irrigation lines and farms, separate the line sections, then brush, hose, or soak each one.

Flex Connect Growing Guides

  • Flex Connect Water Health & Flow MaintenanceKeep Flex Connect water healthy: check pH and nutrients at least twice a week, refresh the water on the Flex Farm schedule, and keep your drip lines flowing.
  • Flex Connect Operating Schedule & ProtocolsRun your Flex Connect farm with a daily walkaround and set protocols for water level, drip lines, the pump, transplanting, and harvest.